Book an intro
Blog

How Floor Authority doubled in size with only a few new hires

Case studyGeorge Collier9 October 2026 · 4 min read

Floor Authority installs flooring in new-build homes across South Carolina, for national builders including DR Horton, Lennar and PY Homes. It turns over $24M a year, and every quote, order, invoice and report runs through one system built around how the business works.

$24M

Annual revenue running on their software

2x

Growth, with only a few new hires

+25%

Staff productivity measured by CEO

~$24K

Annual subscription savings, excluding NQU fees

Why flooring needed a different system

Floor Authority tried two off-the-shelf systems before building its own. Neither fitted the way the team priced and ordered flooring. Products come in boxes, rolls and different units of measurement. The system needs to connect the quantity a customer buys with the quantity the team orders and installs.

RT built the original system and had the business using it by January 2022. He later brought in NQU to develop and maintain it. He explains the business requirements; we work out the implementation, build it and review it with him before release.

We are able to build software around the way we want to run our business, instead of having to run our business based on the workflows of a traditional ERP/Project management platform.
RT Bayles
President, Floor Authority

Pricing that follows the sale

The pricing work includes default margins and item-specific overrides. Some customers also buy work at a single agreed price. For those orders, RT requested a contract price level so his team could enter the agreed amount separately from individual product prices.

These details affect what the team can quote and how they maintain prices. We work through them with RT as part of the build, rather than expecting staff to adapt every sale to a fixed pricing model.

A schedule connected to the work

Floor Authority uses installation calendar entries as work orders. Each entry includes the labour lines that determine installer pay. The team also needs to reserve a place on the schedule before deciding which installer will take the job.

Those requirements connect scheduling to the order and payment records. A calendar entry needs to carry the information the office and installers use to complete the work.

Adding equipment tracking

The team can see which equipment each employee has and what's available to issue, all within the employee module.

RT reviewed the module in January 2026 and approved it for use. We deployed it the next day, with room to add features after the team had used it. The employee module also sat alongside their existing payroll software, Gusto, which RT wanted to keep.

What the business runs on

Today, the system handles:

Here's a new house going through it, from the lot being set up to the builder's numbers.

app.floorauthority.com/projects

Projects

38 active
New Project
Upcoming1
Lot 9Mitchell
Indigo Fields
PCPalmetto Crest Builders
Estimating
Pre-Walk2
Lot 17Belmont
Wren Hollow
HRHarbor Ridge Homes
On Order
Lot 112Cypress II
Cypress Bend
BHBluewater Homes
Order All

The results RT reported

In March 2025, RT reported that the business had grown by more than 100% in the two years since launching FloorCore, without a comparable increase in staff. He estimated that staff were around 25% more productive than with their previous systems, helping the team handle the additional work.

RT also estimated annual software subscription savings of about $24,000.

Keep improving what the team uses

The work continues as the team finds new requirements. RT reviews changes, staff test them in their workflows, and we adjust the system based on that feedback. Pricing, task management and equipment tracking can improve without replacing the whole system each time.

Keep reading

Want software built around your business?

In 30 minutes, we'll find where your team loses the most time and what we'd build first.

5.0 from 208 reviewsGold Bubble Partner